SOCROOT / LABS

Case study explorer

Explore the integration decision

Compare published findings, inspect evidence semantics and test a simplified eligibility model.

Selected OEM findings

AXIS Camera Station Pro

First transport-validation candidate

The assessed documentation describes continuous plain-text audit and event exports. Validate raw receipt, rotation and exact authentication fields before relying on the route.

AXIS user manual

Genetec Security Center

Strongest documented app-event coverage among evaluated products

Documentation covers app logons and selected audit changes. Evaluation entitlement, scheduled export completeness and field fidelity remain PoC dependencies.

Genetec documentation portal

Evidence classification explorer

Filter four publication-safe examples by status. The hypothetical example represents only an input to the simulator.

Documented · File collection

Wazuh describes what its log collector accepts. Documentary support applies to this capability.

Wazuh localfile reference

Proposed · Secure handoff

A read-only collector and a supported intake are a candidate design subject to validation.

Unconfirmed · Exported actor field

Check the raw exported record, then compare it with the operator action and host evidence.

Hypothetical · Missing mandatory event

Set the event-coverage gate to FAIL to explore its modeled consequence.

Illustrative Decision Simulator

All inputs below are hypothetical. This simplified model illustrates decision gates. Scope the proposed PoC using the documentary findings and empirical checks.

Proposed Wazuh architecture

Each handoff is a validation dependency. Supported collection paths depend on the evaluated build.

  1. Application auditEstablish event class and source identity.
  2. Supported audit exportConfirm representation, entitlement and completeness.
  3. Secure collectionUse a read-only collector, a Wazuh Agent or an approved intake.
  4. Wazuh ManagerReconcile receipt before parsing and normalization.
  5. Host correlationJoin application and host evidence with justified identity and time bounds.

PoC readiness

Prospective acceptance areas. Each layer remains open and must be assessed separately.

L1 · Transport

Reconcile a known source event with raw receipt and capture recovery results across restart and rotation.

L2 · Semantics

Validate actor, action, target, timestamp and outcome against an approved reference.

L3 · Correlation

Justify identity and time matching, then test ambiguity and alternative explanations.

Validation boundaries

Documentary assessment

Completed · PASS

Product documentation supports a conditional recommendation to scope a transport-validation PoC.

Empirical PoC

Open · Not performed

Collect and reconcile observations in an authorized lab.

Production suitability

Undetermined

Assess security, operations and support after empirical validation.